Archaeological Assessment of Project IR-75-2(155), Henry/Clayton Counties

Report Number
6537
Year of Publication
1991
Abstract

This is the proposed within-median widening of Interstate 75 from a point just south of 1-675 to a point just south of 1-285. The total length of the project is 10.9 miles. An archaeological survey (Level I) was conducted in accordance with "GDOT Archaeological Survey Guidelines" developed by the GDOT Staff Archaeologists in consultation with DNR Historic Preservation Section Staff and concurred in by the Federal Highway Administration and State Historic Preservation Officer. These guidelines provide general survey boundaries and methodological approaches to archaeological surveys based on the type/scope of proposed highway projects and are followed during the initial identification of archaeological resources. No significant archaeological resources were located within the proposed project corridor as described in paragraph two above. It is concluded, therefore, that the project would have no effect upon archaeological resources on or eligible for inclusion in the NRHP provided that the project conforms to that described above.