Reevaluation of the Northwest Corridor Project, Phase 1, Cobb County, Georgia

Author(s)
Report Number
7615
Year of Publication
2010
County
Abstract

This reevaluation examined only changes since previous archaeological survey to the five areas identified for initial construction (Phase 1 ). This project is a Design, Build, Finance (DBF) project and has been procured as a Public-Private Partnership (P3). As part of the design-build process, the P3 Developer has identified five areas for initial construction. On the construction phasing plan (see attached), these areas are identified as: • Phase I Early Roadway Package (ERP) 1 - Package A • Phase I ERP 2 - Package B • Phase I ERP 3 - Package B • Phase I ERP 4 - Package C • Phase I ERP 5 - Package D The project location is shown in attached Figure 1. Changes in design in these five areas are described.