Back to top

"Second Addendum to the Phase I Archaeological Survey for SR 520/US 82 and County Line Road

Report Number
7629
Year of Publication
1977
County
Abstract

The proposed project would improve the intersection of SR 520/US 82, South County Line Road, and North County Line Road within the unincorporated Acree community in Dougherty County, Georgia. The proposed project would extend approximately 1,241 feet west and 1,400 feet east of the intersection on SR 520/US 82, approximately 1,251 feet south of the intersection on South County Line Road, approximately 700 feet north of the intersection on North County Line Road, approximately 206 feet north of SR 520/US 82 on Old County Line Road, approximately 118 feet east of existing South County Line Road on Railroad Street, and approximately 106 feet east of existing South County Line Road on Acree Avenue. The total project length would be approximately 2,641 feet along SR 520/US 82 and approximately 5,022 feet (1.0 mile) for the entire project area. The existing SR 520/US 82 consists of four 12-foot travel lanes, two in each direction, with a 64-foot depressed median. SR 520/US 82 is posted as 55 miles per hour (mph) speed limit and is currently an uncontrolled movement with opposing left turn lanes at the intersection. South County Line Road and North County Line Road consist of two 12-foot travel lanes, one in each direction, and is also posted as 55 mph speed limit. Both South County Line Road and North County Line Road approaches to SR 520/US 82 are stop controlled. The existing ROW width is approximately 240 feet on SR 520/US 82, varies between approximately 80 feet and 100 feet on South County Line Road and North County Line Road, and is approximately 30 feet on Old County Line Road. Railroad Street and Acree Avenue are within the CSX/Georgia and Florida Railway (former Brunswick and Albany Railroad) ROW. The proposed project would install a traffic signal at the intersection of SR 520/US 82, South County Line Road, and North County Line Road. The existing median on SR 520/US 82 would be reconstructed as a Type B median, separating the left turn lanes from the through travel lanes. Right turn lanes would be provided on SR 520/US 82 onto South County Line Road and North County Line Road. Left turn lanes would be installed on both South County Line Road and North County Line Road. The South County Line Road approach would be slightly realigned through the intersection with a horizontal curve to create a seamless through movement between these approaches. This realignment would also correct the substandard intersection skew that is present between the northbound approach and SR 520/US 82. Additional ROW up to approximately 50 feet in width would be required along the north and south sides of SR 520/US 82 for a maximum required ROW width of approximately 290 feet. Additional ROW up to approximately 90 feet in width would be required along the east and west sides of South County Line Road and North County Line Road for a maximum required ROW width of approximately 180 feet. Permanent easements up to 45 feet in width would be required for demolition of structures on the east side of South County Line Road. Temporary driveway easements up to 60 feet in width would be required along the east and west sides of South County Line Road and North County Line Road. ROW up to approximately 70 feet in width would be required for Old County Line Road. Permanent easement up to approximately 230 feet in width would be required within the CSX/Georgia and Florida Railway (former Brunswick and Albany Railroad) ROW.