Back to top

Phase I Archaeological Survey for Proposed Installation of High Mast Lighting along I-75, Bibb County, Georgia

Author(s)
Report Number
8066
Year of Publication
1999
County
Abstract

The project proposes to install high mast lighting along 1-75 from Mile Post (MP) 166.11 Gust south of the Pierce Ave interchange) north 3.5 miles to MP 169.77 Gust south of the Arkwright Rd interchange) (Figure 1). The proposed work will include installation of high mast towers and underground conduit along both outsides of the 1-75 mainline, mounted between 30-50 feet from the edge of pavement. Additional work may include some modifications to parapet walls in some locations. No additional right-of-way (ROW) or roadway changes are expected from the current conditions. No temporary or permanent easements are expected.