Abstract

The overall proposed project would construct an ADA compliant, ten-foot to 12-foot wide multi-use trail beginning at the intersection of US 41 and Barrett Parkway and end at Bells Ferry Road, for a total project length of approximately 4.7 miles. The overall project has been divided into sections (i.e. 2A, 2B, and 2C) based on the available funding to be used. Each section of Phase II has independent utility, logical termini, and could be a stand-alone project if constructed separately. The current submission covers a redesign in the Phase 2C project only.