The proposed project calls for the reconstruction, rehabilitation, and widening of Carpenter Road (CR 75) in Tift County. The project begins at SR 520/US 82 and extends north to Davis Road (CR 216) and is partially within the city limits of the City of Tifton. The length of the project is approximately 2.5 miles. The existing two-lane road will be widened to five lanes with combination bicycle lane/sidewalk, and curb & gutter. The intersections of King Road and Whidden Mill Road will be signalized. Current and proposed right-of-way (ROW) width is 100 feet. Current roadway width is 24 feet (one 12-foot lane in each direction). Proposed roadway width is 62 feet (two 12-foot lanes in each direction plus one 14-foot turning lane). There are no bridges in the project area.