Back to top

Second Addendum to an Archaeological Survey of the Proposed South Calhoun Bypass, Gordon County, Georgia

Author(s)
Report Number
8625
Year of Publication
2015
County
Abstract

The current study consists of an evaluation of changes made to the alignment since the first addendum completed by EPEI in 2007. These changes include the redesign of the northbound ramps for the proposed 1-75/Union Grove Road Interchange. The original design for the South Calhoun Bypass [STPOO-OOMS(007)) included the proposed interchange at Oak Grove Road and 1-75. Since the previous reevaluation, the interchange portion of the project has been separated from the South Calhoun Bypass design and given a new GDOT project number [NHSTP-0075-03(203)]. The changes for the current reevaluation are included on the attached sheet. All changes that resulted in new required ROW requiring additional survey are for the interchange project [NHSTP-0075-03 (203)]. No changes requiring additional survey were made to the South Calhoun Bypass [STPOO-OOMS(007)].