Back to top

Addendum to a Phase I Archaeological Survey of the SR 54 Pedestrian Bridge and Trail, Fayette County, Georgia.

Report Number
9300
Year of Publication
2016
County
Abstract

Since the 2015 original survey, the project APE has changed. The new addendum APE under consideration is a curve extension of the trail APE as seen in Figures 1 and 2. This extension is being considered in order to avoid a potential wetland impact. As the extension exceeds the archaeological survey coverage provided during the 2015 survey, this extension needed to be surveyed. The dimensions of the trail remain consistent with the previous 2015 project description.