Back to top

Phase I Archaeological Survey for Bridge 243-5024-0, County Road 27 over Pumpkin Creek, Randolph County, Georgia

Author(s)
Report Number
9508
Year of Publication
2017
County
Abstract

The Georgia Department of Transportation (GDOT) has developed a Low Impact Bridge program (LIBP) to provide expedited project delivery for the least complicated type bridge replacement projects. Projects that have more time-consuming requirements such as right-of-way (ROW) acquisition or impacts to sensitive environmental resources are not selected for this program. Given that these projects are not intended to go beyond existing ROW (no ROW is to be acquired), the 100-foot expanded survey corridor (ESC) for archaeology will be waived in some instances. Generally, field survey limits will extend 300 feet from the existing structure approaches and remain within the existing ROW, which varies across projects.

 The project involves the replacement of the bridge carrying County Road (CR) 27 over Pumpkin Creek (Bridge 243-5024-0) under GDOT’s LIBP in Randolph County, Georgia. The existing bridge is structurally deficient and will be replaced. Design plans for the new project were not yet available at the time of the archaeological survey. Existing right-of-way (ROW) measures 50 feet. No temporary roadways or bridges are proposed for the project.