Back to top

Phase I Archaeological Survey for the Proposed Construction of a Frontage Road along 1-20 in Warren County, Georgia.

Author(s)
Report Number
9941
Year of Publication
2017
County
Abstract

The proposed project would consist of the construction of a two-lane roadway on new location along the south side of Interstate 20 (1-20) from Country Road (CR) 184/Cadley Road to CR 167/Ridge Road, approximately 2.44 miles in length. The constructed roadway would provide sufficient infrastructure to access large parcels of undeveloped land and serve future development, expected to primarily be commercial and light industrial/distribution facilities, and improve mobility and connectivity in the area (see Figures 1 through 3h). The proposed frontage road typical section would include two 12-foot lanes and 10-foot rural shoulders within a 100-foot right-of-way (ROW).