Back to top

Phase I Archaeological Survey of the Proposed Resurfacing along State Route 22, Muscogee County, Georgia

Author(s)
Report Number
8039
Year of Publication
2011
County
Abstract

The proposed work consists of milling, resurfacing, striping, raised pavement markers, and curb cuts along a 4.9 mile section of SR 22 Spur in Muscogee County. The project begins 50 feet east of SRl/US 27 Street and ends 1,222 feet west of Reese Road (Figure 1). The project will take place within existing right-of-way (ROW) which varies throughout. The limits of construction will be 5 feet from the edge of pavement.