Back to top

Archaeological Survey for the Dallas Battlefield Trail, Phase II, Paulding County, Georgia

Author(s)
Report Number
8063
Year of Publication
2014
County
Abstract

The project will be completely within the boundaries of the City of Dallas. The project will complete a 10 ft paved trail (8ft in some locations) from the Chattahoochee Tech Spur of Silver Comet Trail to the City's Sara Babb Park. The trail will then continue from the Phase 1 battlefield trail DOT enhancement project on City-owned property and connect to the City of Dallas' Sara Babb Park. Portions of the multi-use trail on the City owned parcel may be 8 ft wide and contain pedestrian level/boardwalk sections in order to conform to the adjacent mountainous terrain. The project will be designed per the standards required by the Americans with Disabilities Act (ADA).