Back to top

Phase I Archaeological Survey of Proposed Improvements to Maxham Road at SR 6ffhornton Road

Report Number
8742
Year of Publication
2014
Abstract

This project will provide operational and safety improvements along CR 635/Maxham Road for approximately .4 miles from SR 6/Thornton Road to Tree Terrace Parkway. Minor widening will provide an additional through lane in each direction along Maxham road through the SR 6/Thornton Road intersection, along with a westbound left turn lane at Tree Terrace Parkway. A raised concrete median will be provided from SR 6/Thornton Road to Tree Terrace Parkway. Sidewalks will be reconstructed or provided from SR 6/Thornton Road to the Berkshire at Sweetwater Creek Apartments, sidewalks, crosswalks and ramps will be in compliance with ADA guidelines. Minor modifications will be made to the traffic signal at the Maxham Road intersection with SR 6/Thornton Road. The traffic signal at the Maxham Road intersection with Tree Terrace parkway will be replaced. All construction is limited to the current right-of-way (ROW). The maximum width of the current ROW does not exceed 65 feet. Easements for the construction of driveways are located along all driveways on the eastern side of Maxham Road. There are three locations for temporary construction easements: along the driveway to Village at West Fork, across Maxham Road from the entrance to Birch Landing Apartments, and along the ROW near the northeastern extent.