Back to top

1-85 SB Ramp to SR 6- Drainage Improvements

Author(s)
Report Number
8886
Year of Publication
2001
Abstract

The proposed work consists of upgrading present drainage structures, adding a new drainage structure and adding new drain pipes. The grade of the existing ditch will be lowered approximately 4 feet. This project also includes the addition of guardrail. All activities will be confined within existing right-of-way and no easement will be required.