Back to top

Phase I Archaeological Survey of the Proposed Bridge Rehabilitation at State Route (SR) 25 at the Savannah River

Author(s)
Report Number
9007
Year of Publication
1976
Abstract

The project will consist of heat straightening/replacing damaged steel superstructure truss members, pile jacketing of concrete piles, application of a co-polymer deck overlay, joint replacement, and repair of spalls in the superstructure and substructure at SR 25 over the Savannah River. The project will take place within existing right-of-way (ROW) which varies throughout.