Back to top

Addendum - Phase I Archaeological Resources Survey of Additional Right-of-way and Easements for the Proposed 1-75 and 1-575 HOV Lane Construction - The Northwest Corridor

Report Number
9138
Year of Publication
2015
Abstract

The Northwest Corridor Project proposes to add reversible managed lanes on 1-75 and 1-575. A single reversible lane will be constructed in the 1-75 median north of the 1-575 split to Hickory Grove Road. Two reversible lanes will be constructed on the west side of 1-75 from 1-285 to just north of Bells Ferry Road. The project area consists of both previously surveyed and new rights-of-way and easements within the Northwest Corridor. The new sections surveyed and reported in this addendum are located at the Canton Connector and South Marietta Parkway interchanges (Exits 267 and 263), from Wade Green Road to above the Hickory Grove Road overpass, and along Hickory Grove Road. See attached for additional description.