Back to top

Archaeological Survey of the Main St, First Ave and Railroad Ave Pedestrian Improvements

Author(s)
Report Number
8151
Year of Publication
2009
Abstract

The project would include the replacement of existing uneven and inadequate sidewalks, as well as the provision of ramps and streetscape improvments along the south side of Main St, beginning at Church St and ending at First Ave. The 4ft sidewalks along this segment of Main St would be 7ft and ramp access would be installed at street intersections. Curb and gutter will be installed along both sides of the Main St. Along the south side of Main St, beginning at First Ave. and ending midblock before Railroad Ave, the existing 4ft sidewalk would be replaced with 1Oft sidewalk with the interior 5ft of the sidewalk devoted to staggered planter areas and streetUghts. Curb and gutter will also be installed as part of these improvements. The remainder of this block and both sides of Main St from Railroad Ave to the Camp Creek Greenway would include signage and other enhancements to a City-funded streetscape improvement project currently under construction. Sidewalks would also be constructed along the western side of First Ave, beginning at Main St and ending at Lula St, with additional streetscaping, such as lighting and benches to enhance walkability. Curb and gutter will be installed as part of these improvements.