Back to top

Archaeological Assessment of a Proposed Resurfacing and Maintenance Project along State Route 76 in Berrien County, Georgia

Author(s)
Report Number
9719
Year of Publication
2016
Abstract

The proposed work consists of milling, patching, resurfacing, striping, as well as the installation of raised pavement markers with 4-foot earth shoulder filling and curb cuts along a 10.67-mile section of State Route (SR) 76 in Berrien County, Georgia from the SR 11/U.S. Highway (US) 129 intersection in Nashville to the SR 135 intersection (Figure 1). The project will take place within existing right-of-way (ROW), which varies throughout. The limits of construction will be 5 feet from the edge of pavement.