Back to top

Phase I Archaeological Survey of Proposed Resurfacing along State Route 23 in Tattnall County, Georgia

Author(s)
Report Number
10091
Year of Publication
2017
Abstract

The proposed work consists of resurfacing, patching, milling, striping, raised pavement markers, four foot earth shoulder filling, and curb cuts for wheelchair ramps along an 14.04 mile section of State Route (SR) 23 from SR 30 in Riedsville to SR 57 in Cobbtown, Tattnall County, Georgia (Figure 1). The project will take place within existing right-of-way (ROW) which varies throughout. The limits of construction will be 5 feet from the edge of pavement.