Back to top

Archaeological Assessment of a Barrow County Resurfacing Project

Author(s)
Report Number
10569
Year of Publication
2004
County
Abstract

This proposed project is 1.08 miles long and consists of resurfacing, milling and symmetrical concrete trench widening on SR 11 beginning at Stephens Street and extending north to Shenandoah Drive. No additional right-of-way is required. This project includes 1.08 miles of resurfacing, milling and symmetrical

Concrete Trench Widening on SR 11 beginning at Stephens Street and extending North to Shenandoah Drive.