Back to top

Archaeological Assessment of Project STP-M001-00(270), Camden and Glynn Counties

Report Number
10682
Year of Publication
2001
Abstract

Paving two feet of existing shoulder on each side of SR 25, as well as leveling and resurfacing a portion SR 25 beginning at the Florida state line in Camden County and ending at milepost 2.15 in Glynn County. The entire length of the project is 34.141 miles. No additional right-of-way will be required. Pursuant to the February 2000 Memorandum of Understanding (MOU) between the Federal Highway Authority (FHWA), the State Historic Preservation Division of the Department of Natural Resources (SHPO), and the Georgia Department of Transportation, this project is considered an undertaking as defined in 36 CFR 800.16(y), however, it has been determined there is no potential to affect historic properties included in or considered eligible for inclusion in the NRHP.