Back to top

Archaeological Assessment of a Lumpkin County Resurfacing Project

Author(s)
Report Number
10754
Year of Publication
2005
Abstract

Archeological Assessment of a Lumpkin County Resurfacing Project. This proposed project consists of the milling, leveling and resurfacing on SR 52 beginning at M.P. 14.93 and ending at the Lumpkin/Hall County Line (M.P. 24.73). All work will take place within the existing right-of-way, with no new right-of-way required. Total project length is approximately 9.8 miles.