Phase I Archaeological Survey of Proposed Resurfacing along State Route 138 in Clayton and Henry Counties, Georgia

Author(s)
Report Number
10962
Year of Publication
2018
Abstract

The proposed work will take place along a 3.92 mile section of State Route (SR) 138 in Clayton and Henry Counties from north of Bam by Lane to the on and off ramps of Interstate (I-) 75 (Figure 1). The proposed work consists of milling, patching, resurfacing, striping, raised pavement markers, and curb cuts to install wheel chair ramps. The project will take place within existing Right-of-Way (ROW), which varies throughout. The limits of construction will be 5 feet from the edge of pavement. Work on all bridges with concrete decks will be limited to restriping only.