Back to top

Archaeological Assessment of Project BRF-076-1(19), Lincoln County

Author(s)
Report Number
11351
Year of Publication
1988
Abstract

Existing structure is 21.8’ x 230' concrete and steel bridge. Existing right of way is 200 ft. Project begins 400' south of stream and ends 450' north of stream. New structure is a 38' x 230' concrete bridge. No R/W will be required. No detour will be constructed, will use other state routes.