Back to top

Archaeological Assessment of Project BRF-131-1(6), Seminole County

Report Number
11412
Year of Publication
1990
Abstract

200’ x 40’ concrete bridge constructed on existing alignment. No additional right of way will be needed. A detour bridge will be constructed on the south side of the existing bridge.