Back to top

Bridge Review Sheet, BRZLB-81(3) Crisp County

Author(s)
Report Number
11619
Year of Publication
1986
Abstract

This is a bridge project, BRZLB-81(3), located in Crisp County. The bridge is on CR 1 and crosses Swift Creek. The existing structure is 30 feet long and 23.5 feet wide. It is a concrete bridge with 80 feet of existing ROW. The proposed project would replace the existing structure with a double, double 10 foot by 6 foot by 36 foot bridge culvert.