Back to top

Archaeological Assessment of STP-0953(12), Effingham County

Report Number
11902
Year of Publication
1995
County
Abstract

The pipes at Ebenezer Creek are proposed to be replaced with a double-double 3.0m x 3m (10’ x 10’) bridge culvert and 6.7m (22 feet) of asphalt paving with 1.5m (5 foot) wide earth shoulders on existing alignment. The road will be closed and an off-site detour will be used. An additional 6.1m (20 feet) of right of way will be needed, 3m left and 3m right.