Back to top

Project STP-26-1(76) Muscogee County, Determination of No Undertaking

Report Number
12115
Year of Publication
1997
Abstract

Project STP- 26-1(76), Muscogee County: Determination of No Undertaking; the subject project would consist of milling, leveling, and resurfacing of SR 1 in Muscogee County. The project would begin at the bridge over the Chattahoochee River (MP 0.00) and would extend south to end at the bridge over I-85 (MP 5.83). No earthwork would be involved in the process of milling, leveling, and resurfacing the existing roadway. No acquisition of additional right-of-way or construction would be required to implement the project. According to 36 CFR 800.2(o), an "undertaking" consists of "any project, activity, or program that can result in changes in the character or use of historic properties, if any such properties are located within the proposed project's area of potential effects. This project does not have the potential to result in changes to the character or use of any historic properties, therefore, the subject project does not constitute an undertaking. This finding fulfills the Department's requirements under Section 106.