Previously, right-of-way acquisition was limited to miters at each quadrant of the intersection. A 25-foot wide and 330 foot long strip of additional right-of-way was also required along the south side of SR 16. west of CR 55. No right-of-way was required along either side of CR 55, except miters at the quadrant of the intersection. A total of 0.30 acre of additional right-of-way was required.

On SR 16, the project began approximately 450 feet west of the intersection and ended approximately 500 feet east of the intersection. On CR 55IWilson Road, the project began approximately 350 feet south of the intersection and ended approximately 350 feet north of the intersection. Please see separate sheet for current design plans.