This project proposes to widen both approaches of SR 120 to its intersection with SR 141. The existing location consists of four 12' travel lanes, curb and gutter, 5' grass shoulders, and sidewalk in some locations. The proposed new configuration will consist of five 12' travel lanes (one through lane in each direction, two left turn lanes, and one right turn lane), curb and gutter, 5' grass shoulders, and sidewalk in some locations. The existing right-of-way on SR 120 is approximately 80', with an additional 5' to 10' of right-of-way and easements required. Total project length is 1000'.