Back to top

Archeological Survey of project CSSTP-0007-00(116), Cobb County

Author(s)
Report Number
3009
Year of Publication
2005
County
Abstract

This project proposes to upgrade the traffic signal equipment on SR 280/South Cobb Drive from 1-285 to Pat Mell Road. The intersections involved will be all intersections within the termini that have existing signals. All work will take place within the existing right-of-way, no new right-of-way will be required. Total project length is 6.41 miles.