Back to top

Addendum to the Phase I Archaeological Survey of the SR 138 Extension, Walton County, Georgia

Author(s)
Report Number
3672
Year of Publication
2006
Abstract

Original: GDOT proposes to extend SR 138 on new location from U.S. 78/SR 10 Bypass to SR 11. The proposed typical section would consist of two 12-foot travel lanes separated by a 14-foot center turn lane on approximately 150 feet of right-of-way. The proposed project is approximately 1.5 miles long. Addendum Project Description: There was a shift in alignment for the proposed extension, beginning about 600 feet south of where the new Double Springs Church Connector will intersect with SR 138 Extension, and extending to SR 11. The shift tapers from the previous alignment to a maximum of about 70 feet.