Phase I Archaeological Survey of the Proposed ADA Ramp Improvements and Signal Installations, Fulton County, Georgia

Author(s)
Report Number
3701
Year of Publication
2006
Abstract

The proposed project will bring existing non-ADA compliant pedestrian ramp geometrics into compliance with ADA regulations. In addition to geometric improvements, additional signal control may be required and, therefore, included in the design documentation. These intersections include: 1. Piedmont Ave. at 12th St. 2. Juniper St. at 7th St. 3. Juniper St. at 3rd St. 4. Spring St. at 16th St. 5. Spring St. at 14th St. 6. West Peachtree St. at 5th St. 7. West Peachtree St. at Pine St. The proposed project would also consist of pedestrian traffic signal installations at the following five intersections: 1. Peachtree St. at 6th St. 2. Juniper St. at 6th St. 3. Spring St. at 12th St. 4. Piedmont Ave. at 8th St. 5. West Peachtree St. at 12th. St.