Back to top

Revised Phase I Archaeological Survey of Peachtree Road, Reachtree Industrial Boulevard and Perimeter Summit Parkway Signal Design Project Areas, DeKalb County, Georgia

Author(s)
Report Number
3724
Year of Publication
2006
Abstract

The revision consists of the removal of the intersection of Perimeter Summit Parkway with Parkside Place and the intersection of Lake Heam Drive with Parkside Place and the addition of the intersection of Motor Industrial Way with the Brandsmart entrance and the intersection of Motor Industrial Way with the General Motors Plant Central D/W. The project description and survey conclusions are otherwise unchanged (see attachment). Area of Potential Effect: With regard to potential archaeological deposits, the APE is confined to the planned construction limits of the improvements.