Back to top

Addendum to Phase I Archaeological Survey of Foe Killer Creek Bridge Replacement and Associated Road Improvements Project Area, Fulton County, Georgia

Author(s)
Report Number
3851
Year of Publication
2007
Abstract

Original: The proposed project would consist of roadway improvements to Old Roswell Road/Rock Mill Road (CR 1332) from Mansell Road to Sanctuary Parkway in Fulton County. Improvements to Old Roswell Road/Rock Mill Road (CR 1332) would consist of a four-lane roadway divided by a 20-foot raised median with 16-foot urban shoulders, turn-lanes at all signalized intersections, and upgrading the existing traffic signal on Old Roswell Road/Colonial Parkway. In addition, the proposed project would include a 200-foot long double concrete box culvert over a tributary of Foe Killer Creek and the replacement of the existing structurally and functionally deficient bridge on Old Roswell Road/Rock Mill Road (CR 1332) over Foe Killer Creek. The existing 20-foot wide and 41-foot long bridge would be replaced on the existing alignment with a new 3-span bridge, 89 feet wide and 134 feet long. The proposed bridge would provide four 12-foot travel lanes, divided by a 20-foot raised (continued on separate sheet). The APE for the project includes everything within the proposed construction project length and within the maximum extent of the existing and required right-of-way as described above.