Back to top

Addendum to Archaeological Recources Survey for the Proposed State Route 74 Bridge Replacement over Line Creek Creek, Coweta and Fayette Counties, Georgia

Report Number
3869
Year of Publication
2005
Abstract

This project serves as an addendum to a previous archaeological resources survey conducted in advance of a proposed bridge replacement where SR 74 crosses Line Creek (Hicks and Gardner 2003). The new APE is located immediately west of the previous APE, north and south of Line Creek along SR 74.

The APE is defined as the length and width of the project corridor. The total APE is 2300 feet long and 150 feet wide west of SR 74 and 100 feet wide east of SR 74. For this addendum to the project, the APE includes a 2180 by 50 foot wide corridor west of SR 74.