Phase I Archaeological Survey of the Gravel Springs Road Widening Project, Gwinnett County, Georgia

Author(s)
Report Number
3898
Year of Publication
2007
County
Abstract

Project Description:

The project is a Phase I Archaeological Survey of the impact area for the proposed widening and bridge replacement of Gravel Springs. Road at I-85. The Project also investigated new alignment corridors for Morgan Road and Camp Branch Church Road, which will be moved further away from I-85 to allow for future exit ramp construction.

Area of Potential Effect:

The APE consists of 0.78 mile along both sides of Gravel Springs Road, that includes a single bridge 531 feet long. Additionally, 0.53 mile of Morgan Road and 0.58 mile of Camp Branch Church Road are to be relocated away from their existing locations along I-85 to allow for future addition of exit ramps and HOV lanes.