Back to top

The Phase I Archaeological Survey for the Proposed Replacement of the US 41/SR 3 Bridge Over Tiger Creek, Catoosa County, Georgia

Report Number
3932
Year of Publication
2007
Abstract

During December 2006, Edwards-Pitman Environmental, Inc. (EPEI) conducted a Phase I archaeological survey of the proposed location for the United States (US) 41 bridge over Tiger Creek in Catoosa County, Georgia. The project area is southeast of Ringgold. The goal of the survey was to locate and evaluate archaeological sites within the Area of Potential Effect (APE) of the proposed undertaking, so that potential effects to any resources identified could be evaluated in accordance with Section 106 of the National Historic Preservation Act. The project was conducted under a contract with Street Smarts, Inc.