Back to top

Second Addendum to Phase I Archaeological Survey of Eagle's Landing Parking from Villege Center Parkway

Author(s)
Report Number
4362
Year of Publication
2008
County
Abstract

This project proposes to continue the widening of Eagle's Landing Parkway from Village Center Parkway through the intersection with SR 42/US 23 to 700 feet east of Talon Place. The widening of Eagle's Landing Parkway west of Village Center Parkway is currently under construction as part of NH-IM-75-2(212), which is an interchange project that was let for construction in December 2003. The interchange project will replace the 2-lane bridge over 1-75 with an 11-lane bridge with a raised median. The 11-lane section will narrow to 6 lanes with a 20' raised median in the vicinity of Village Center Parkway, where the proposed project, STP-0002-00(638), will continue the 6-lane footprint. After the intersection with SR 42/US 23, the 6-lane section will be reduced to 4-lanes with a 20' raised median, which matches the configuration of Phase I of East Lake Parkway Extension at the proposed project's eastern terminus. The existing right-of-way along Eagles Landing Parkway is 200 feet and no additional right-of-way would be required:Right-of-way acquisition would be required along SR 42/US 23. The existing right-ofway is 165 feet and the required right-of-way would be 180 feet. Right-of-way would also be required along East Lake Parkway. The existing right-of-way is 92 feet and the required right-of-way is 150 feet. Right-of-way would also be required at intersection miters. The second addendum to this project will include the addition of Four M Loop which consists of 2 lanes, 12' wide and approximately 400' in length connecting Eagles Landing Parkway and Four M Way.