Back to top

Archaeological Assessment of Project STP-0001-00(574), Bartow County

Report Number
4703
Year of Publication
2000
County
Abstract

The proposed project would consist of reconstruction of median crossovers along SR 3/US 41 at various locations in Bartow County. The project begins at the Cobb County/Bartow County Line and proceeds northward to the SR 293 Connector. The total length of the project is 15.15 miles. No additional right-of-way would be required. An archaeological survey consistent with the project description was conducted along the entire project corridor.