Phase I Archaeological Survey of the Sugarloaf parkway at I-85 and various Interchanges and Improvements to I-85, Gwinnett County

Report Number
5549
Year of Publication
1997
Abstract

New South Associates conducted a Phase I archeological survey of the roposed Sugarloaf Parkway at 1-85 and various interchanges and improvements to 1-85 from October 21 through October 26, 1992. The project area lies in and around the existing 1-85 right-of-way between Old Norcross Road and approximately 2,000 feet north of Old Peachtree Road and is approximately four miles in total length. A pedestrian survey designed to identify archeological sites was conducted. No sites were discovered by the survey and no further archeological study is recommended.