Back to top

Archaeological Assessment of Project IR-75-3(165), Cobb County

Author(s)
Report Number
6309
Year of Publication
1985
Abstract

This is the proposed widening of the south-bound 1-75 Exit Ramp at Windy Hill Road and the attendant lane addition to the mainline. An archaeological survey (Level i ) was conducted in accordance with "GDOT Archaeological Survey Guidelines" developed by the GDOT Staff Archaeologists in consultation with DNR Historic Preservation Section Staff and concurred i n by the Federal Highway Administration and State Historic Preservation Officer. These guidelines provide general survey boundaries and methodology approaches to archaeological surveys based on the type/scope of proposed highway projects and are followed during the initial identification of archaeological resources. No significant archaeological resources were located within the proposed project corridor as described in paragraph two above. It is concluded, therefore, that the project will have no effect upon archaeological resources on or eligible for inclusion in the NRHP provided that the project conforms to that described above.