Back to top

Archaeological Assessment of Project IR-85-2(112), Gwinnett County

Report Number
6409
Year of Publication
1977
Abstract

This project proposes the widening of 1-85 from the junction of S.R. 120 north to the junction of 1-985. The project will occur within existing right-of-way, adding one 12 foot lane to both directions of the existing facility. The total project length is 6 miles. An archaeological survey (Level I ) was conducted in accordance with "GDOT Archaeological Survey Guidelines developed by the GDOT Staff Archaeologists in consultation with DNR Historic Preservation Section Staff and concurred in by the Federal Highway Administration and State Historic Preservation Officer. These guidelines provide general survey boundaries and methodology approaches to archaeological surveys based on the type/scope of proposed highway projects and are followed during the initial identification of archaeological resources. No significant archaeological resources were located within the proposed project corridor as described in paragraph two above. It is concluded, therefore, that the project will have no effect upon archaeological resources on or eligible for inclusion in the NRHP provided that the project conforms to that described above.