Back to top

Assessment of Project MLP-779(3), Gwinnett County

Report Number
6426
Year of Publication
1992
County
Abstract

The proposed project would consist of the removal of an existing gravity wall and driveway and the construction of a proposed gravity wall and driveway at Glover Baptist Church on Jimmy Carter Boulevard near it's intersection with Singleton Road. No new right-of-way is required. An archaeological survey consistent with the project description was conducted for the entire length of the project corridor. An archaeological survey (Level I) was conducted in accordance with "GDOT/FHWA Cultural Resource Survey Guidelines" developed by the GDOT Staff Archaeologists in consultation with DNR Historic Preservation Section Staff and concurred in by the Federal Highway Administration and State Historic Preservation Officer. These guidelines provide general survey boundaries and methodological approaches to archaeological surveys based on the type/scope of proposed highway projects and are followed during the initial identification of archaeological resources. No existing or eligible National Register archaeological resources were located within the project's area of potential environmental effect. It is concluded, therefore, that the project will have no effect upon archaeological resources on or eligible for inclusion in the NRHP provided that the project conforms to that described above.