Addendum: Phase I Cultural Resource Survey and Archaeological Inventory of Proposed Acess Road AR-05A and Tara Field Meter Station Work Space Associated with the 10.24 km (6.36 mi) long 30-in O.D. Triangle Pipeline Project, Spalding and Henry Counties…

Report Number
6843
Year of Publication
2002
Abstract

This document presents the results of an additional Phase I cultural resources survey and archeological inventory consisting of a proposed access road (AR-OSA) and workspace (Tara Field Meter Station Extra Workspace); both project items are associated with the proposed 10.24 km (6.36 mi) Long 30 in O.D. Triangle Project. No archeological sites or historic standing structures were identified as a result of this survey; therefore, no additional testing of the proposed project items is recommended.