Back to top

Proposal to the Georgia Power Company for Archaeological Mitigation in the Wallace Dam Tailrace Area

Author(s)
Report Number
7252
Year of Publication
1997
Abstract

An archaeological survey of the Wallace Dam tailrace area was conducted for the Georgia Power Company in late 1976-early 1977. Two sites, Pm 215 and Pm 247, were located and evaluated by the survey archaeologist, W. Dean Wood (1977).