Back to top

Archaeological Reassessment of Project BRF-114-1(93), White County

Author(s)
Report Number
10534
Year of Publication
2000
County
Abstract

Project BRF-114-1 (93) would replace the narrow and structurally deficient bridge on SR 115 over the Chattahoochee River in White County. The proposed project on SR 115 would begin approximately 1600 feet west and end approximately 1600 feet east of the existing bridge over the Chattahoochee River. The existing right-of-way on SR 115 is approximately 100 feet, while the proposed additional required right-of- way would be a maximum of approximately 150 feet. An archaeological survey consistent with the proposed project description was conducted for the entire length of the project corridor.

Abstract 10535

This project consists of milling, leveling, resurfacing, and shoulder building on SR 22, beginning on the east side of Tobesofkee Creek Bridge (M.P. 6.59) and ending on the west side of the Intersection with Broadway Street/US 24 at M.P. 13.76. All work will take place within the existing right-of-way, no new right-of-way is required. Total project length is 7.05 miles.