Archaeological Assessment of Project BF-029-1(28), Macon County

Report Number
11432
Year of Publication
1993
Abstract

25.2'X 60' bridge with timber pilings and a concrete deck. Approaches have 24' paving with 7' shoulders. Existing right-of-way is approximately 100'. Replace bridge on existing alignment with a triple 9'x 9' concrete bridge culvert. Reconstruct approaches to provide 24' paving and 10' shoulders. The required right-of-way is 150 feet. The road will be closed during construction and traffic will be routed to an off-site detour utilizing SR 26 and CR 15.