Back to top

Archaeological Assessment of Project BRZLB-121(4), Fulton County

Author(s)
Report Number
11598
Year of Publication
1994
Abstract

The replacement bridge would be a 18.3m x 8.5m (60' x 28 ') bridge and would provide a 1.8m (6') sidewalk left and right. The approaches would consist of 7.3m (24') of pavement with curb and gutter. The project would replace the existing bridge on existing horizontal and vertical alignments within 18.3m (60') of right-of-way. Traffic would be maintained by detour route on state and local roads and streets until the proposed structure is completed.