Archaeological Reassessment of Project of Project STP-0003-00(787), Troup County

Author(s)
Report Number
11976
Year of Publication
2006
County
Abstract

In compliance with Section 106 of the National Historic Preservation Act of 1966 and amendments thereto, project STP-0003-00(787), Troup County, has been surveyed with respect to archaeological resources, especially those on or eligible for inclusion in the National Register of Historic Places (NRHP)." The purpose of the survey was to locate, identify and evaluate the significance of any archaeological resources within the proposed project's area of potential environmental effect. STP-0003-00(787) would widen the northbound and southbound off ramps on SR 403n-85 to provide for left turn lanes in West Point, Georgia. The project is located at the SR 403n-85/SR 18 intersection. This project was originally surveyed in March 2002 by Teresa Lotti (HPD# HP020318-002). Since that time the project has been changed to include telephone easement within existing right-of-way on SR 18. The existing right-of-way for SR 18 is 200 feet. An archaeological survey consistent with the project description was conducted along the entire project corridor. An archaeological survey (Level II) was conducted in accordance with "GDOT/FHW A Cultural Resource Survey Guidelines" developed by the GDOT Staff Archaeologists in consultation with DNR Historic Preservation Division Staff and concurred in by the Federal Highway Administration and State Historic Preservation Officer. These guidelines provide general survey boundaries and methodological approaches to archaeological surveys based on the type/scope of work of proposed highway projects and are followed during the initial identification of archaeological resources. No existing or eligible National Register resources were located within the project' s area of potential environmental effect. It is concluded, therefore, that the project will have no effect upon archaeological resources on or eligible for inclusion in the NRHP provided that the project conforms to that described above.